Path cheatsheet

Care and Referral Coordination: high-yield desk drill

The rule

Own the loop. Do not rewrite the order to fit a slot. Do not document an acceptance that does not exist.

Next step

A referral needs the reason, the relevant records, and any authorization the site requires.

Never miss

  • An open loop needs a next date and an owner.
  • Pending studies are dependencies.
  • A miss is recovered, not deleted.
  • Faxing once is not closure.
  • A specialist referral packet carries the order, the reason for the visit, and the supporting records. The order alone with records later is not enough.
  • A referral loop closes when the visit happened and the report is filed, or when it was declined. Receipt is not closure.

Traps

  • Changing the ordered service because a slot opened.
  • Sending another patient's packet as a filled-in template.
  • Marking complete when the site cannot take the patient.

Shortcuts

  • Reason, records, insurance facts.
  • Ask whether the visit should wait on a pending study.
  • Closed means happened, declined, or refused with a next plan.

Terms

  • Loop. From order to completed visit or a formal close.
  • Dependency. Auth, records, or a pending study the receiver needs.
  • Formal close. Visit happened, patient declined, or site refused and a next plan exists.

Memory hooks

  • NEXT-DATE-OR-IT-IS-A-HOPE. Every open referral needs a time Coordination.